Solarvalue: What ever happened to the M5 arc furnace?
I was sort of boycotting them after Solarvalue Newsletter 1/2007, and the past two press releases were a bit more hype than substance:
Solarvalue Site in Slovenia Takes up Engineering Work in Preparation of Solar Silicon Production
Solar grade silicon produced from metallurgic silicon - Solarvalue AG presents process at Photovoltaic Technology Show 2007
I did get to speak with Solarvalue’s Investor Relations contact, Maximilian Fischer, on Wednesday, March 14, 2007. While we had a nice chat, there was no post worthy, actionable information. Mr. Fischer verified the new arrangement with W&P Profil regarding the TDR facility was in effect a sale lease back type deal.
In Solar Grade Silicon roads lead to Ruše - Part 3, I speculated about the abrupt switch to the M6 arc furnace by Solarvalue:
I suspect there must be a major or catastrophic issue with the M5 arc furnace for a plan that requires a bearing assembly to be installed on M6.
In truth, I verified the following information with an independent, confidential source. The M5 arc furnace is back in operation producing calcium silicon (CaSi 30) for W&P Profil. But it is possible M5 will be producing metalurgical grade silicon in 1-2 months. I will leave the speculation on this news to the readers of this Blog.
Labels: Solarvalue
<< Home